HRC Ledger
Opportunity

NEWPCC SBR Aeration Piping Modification and Repair

Response due

March 31, 2023

Agency
City of Winnipeg
Estimated value
Not stated
D2. SCOPE OF WORKD2.1 The Work to be done under the Contract shall consist of the repair and modification of the existing aeration piping for NEWPCC SBR-1 and SBR-2.D2.2 The Contractor shall remove the existing wall mounted supports, fabricate and install new wall mounted supports, re-slope the pipe and incorporate new expansion joints for each piping loop. The Contractor shall further repair and reinstall the damaged aeration piping loop C located in SBR-2. Damaged connections between the existing aeration piping and blower header shall be repaired and reinforced or replace, adding new piping for crossover of flow between SBR-1 and SBR-2 headers.Work shall first be completed on SBR-2 which must be fully operational before work can proceed to SBR-1 which must then be decommissioned and cleaned by the City of Winnipeg prior to entry.D2.3 The major components of the Work are as follows:(a) All work related to the refurbishment of aeration piping for Tank SBR-2(i) Fabrication and installation of new wall mounted supports consisting of a series of fixed and sliding supports to accommodate thermal movement as shown on the drawings.(ii) Lifting, repairing and remounting of the damaged piping loop ‘C’ in SBR-2 as shown on the drawings.(iii) Re-sloping of aeration piping to facilitate drainage between cycles.(iv) Supply and installation of expansion joints in the vertical legs of each piping loop.(v) Fabrication and installation of reinforcement where aeration piping connects to the blower header and replacement of sections of aeration piping as described on the drawings.(vi) Modification of existing blower header, fabrication and installation of new crossover piping and butterfly isolation valve as shown on the drawings.(vii) Removal of existing jacket and insulation on the blower header and drop leg piping sufficient to carry out the work. Insulate and install new jacket as required to restore the existing areas of insulation and to protect the new crossover piping components.(viii) Provision of all scaffolding, lifting equipment or other as required to carry out the work.(b) All work related to the refurbishment of aeration piping for Tank SBR-1(i) Fabrication and installation of new wall mounted supports consisting of a series of fixed and sliding supports to accommodate thermal movement as shown on the drawings.(ii) Re-sloping of aeration piping to facilitate drainage between cycles.(iii) Supply and installation of expansion joints in the vertical legs of each piping loop.(iv) Fabrication and installation of reinforcement where aeration piping connects to the blower header and replacement of sections of aeration piping as described on the drawings.(v) Modification of existing blower header, fabrication and installation of crossoverpiping and connection to butterfly isolation valve as shown on the drawings.(vi) Removal of existing jacket and insulation on the blower header and drop leg piping sufficient to carry out the work. Insulate and install new jacket as required to restore the existing areas of insulation and to protect the new crossover piping components.(vii) Provision of all scaffolding, lifting equipment or other as required to carry out the work.D2.4 The Contractor and their Subcontractors shall:(a) Acknowledge the receipt of the Wastewater Services Division (WWSD) Contractor’s Environmental Preservation and Compliance Package by an email to the Project Manager or Contract Administrator.(b) Comply with the Environmental Management Systems (EMS) Contractor’s package of the Wastewater Services Division attached as Appendix E.(c) Deliver EMS awareness training to employees and anyone who will be working on projects for the Wastewater Services Division (WWSD) through formal education, online training interactive training or work experience.(d) Be aware of their obligation as stated in the Wastewater Services Division’s Environmental Policy that provides overall direction for the WWSD’s environmental performance and provides a framework for setting environmental objectives and targets. This policy can be found online through the City of Winnipeg Wastewater Services website:h ttps://www.winnipeg.ca/waterandwaste/sewage/legislation.stm(e) Identify and understand the environmental impacts of your work. Environmental impacts may include, but are not limited to:(i) Depletion of natural resources(ii) Conservation management and biodiversity(iii) Soil contamination(iv) Air emissions and pollution(v) Water pollution(vi) Noise pollution(vii) Spills and releases(viii) Disturbance to local community and fauna(ix) Use of landfill spaces and waste management

Key dates

Posted
March 17, 2023
Response due
March 31, 2023

Who is this buyer

City of Winnipeg

Organization

City of Winnipeg

Buying history

  • Records46 total
  • Opportunities / awards1 / 0
  • ActiveSeptember 28, 2020 – August 14, 2026

What they buy

  • Administrative (40)
  • Clinical (6)

Also open from this buyer

View source document →

Source link on socrata.

Source record

Buyer type
County
Jurisdiction
(MB)
Set-aside
Not stated
NAICS
Not stated
PSC
Not stated