Opportunity
2020-2021 Outfall Program - Contract 2
Response due
November 24, 2021
- Buyer
- City of Winnipeg
- Agency
- City of Winnipeg
- Estimated value
- Not stated
D4. SCOPE OF WORKD4.1 The Work to be done under the Contract shall consist of:Renewal and Rehabilitation Sites(a) Kingston Row & Dunkirk Drive Outfall (S-MA50017492)(i) Removal and replacement of (+/-) 25.0 m of existing 600 mm diameter CMP with (+/-) 25.0 mof 600 mm diameter CMP (2.8mm) c/w polymer coating(ii) Construction of a new reinforced concrete collar(iii) Chamber manhole cleaning (as required)(iv) Installation of 600 mm diameter debris grate(v) Installation of rockfill riprap(vi) Site Restoration(b) 143 Kingston Row Outfall (S-MA50014591)(i) Removal of (+/-) 17.2 m of existing 800 mm diameter CMP and installation of (+/-)17.2 m of 900 mm diameter CMP (2.8mm) c/w polymer coating(ii) Sewer cleaning (as required)(iii) Construction of a new reinforced concrete collar(iv) Installation of 900 mm diameter debris grate(v) Installation of rockfill riprap(vi) Site Restoration(c) 691 Tache Avenue Outfall (S-MA70047759)(i) Installation of two (2) 1050 mm diameter internal slip joints (custom fit to pipe)(ii) Sewer cleaning (as required)(iii) Removal of existing pipe internal bracing(iv) Removal and re-installation of existing debris grate (as required)(v) Site Restoration(d) 50 Eastwood Drive Outfall (S-MA40000014)(i) Removal and replacement of (+/-) 4.0 m of existing 525 mm diameter CMP with (+/-)4.0 m of 525 mm diameter CMP (2.0mm) c/w polymer coating(ii) Installation of 13.9 m – 450 OD HDPE DR17 Liner Pipe(iii) Sewer cleaning (as required)(iv) Construction of two (2) new reinforced concrete collars(v) Removal and re-installation of existing debris grate(vi) Removal and replacement of installation of rockfill riprap(vii) Site restoration(e) Assiniboine Crescent/Windham Road Outfall (S-MA20005071)(i) Removal of (+/-) 12.8 m existing 750 mm diameter CMP and (+/-) 13.7 m of existing 750 mmdiameter concrete outfall and installation of (+/-) 26.5 m of 900 mm diameter (2.8mm) c/w polymercoating(ii) Construction of a new reinforced concrete collar(iii) Installation of 900 mm diameter debris grate(iv) Installation of rockfill riprap(v) Site Restoration(f) 2782 Assiniboine Avenue Outfall (S-MA70073365)(i) Removal and replacement of (+/-) 3.0 m of existing 750 mm diameter CMP with (+/-)3.0 m of 750 mm diameter CMP (2.0mm) c/w polymer coating(ii) Installation of (+/-) 18.6 m – 600 mm diameter fold and form PVC liner (min. 8.7mm thick)(iii) Sewer cleaning (as required)(iv) Internal polyurethane injection within 1200x900 mm diameter egg concrete sewer (asdirected by the Contract Administrator)(v) Construction of a new reinforced concrete collar(vi) Removal and replacement of rockfill riprap(vii) Removal and re-installation of existing debris grate(viii) Site Restoration(g) 3145 Ness Avenue Outfalls (S-MA20000077 and S-MA20000072)(i) Removal of (+/-) 2.0 m of existing 1050 mm diameter concrete and (+/-) 12.9 m of existing1050 mm diameter CMP and installation of (+/-) 14.9 m of 1200 mm diameter CMP (2.8mm) c/w polymer coating(ii) Removal of (+/-) 12.0 m of existing 600 mm diameter CMP and installation of (+/-)12.0 m of 600 mm diameter CMP (2.0mm) c/w polymer coating(iii) Construction of two (2) new reinforced concrete collars(iv) Installation of 600 mm diameter debris grate(v) Installation of rockfill riprap(vi) Site Restoration(h) 937 Wellington Crescent Outfall (S-MA60007249)(i) Installation of four (4) internal pipe sleeves within 750 mm diameter concrete outfall(ii) Sewer cleaning (as required)(iii) Installation of 750 mm diameter debris grate(iv) Installation of rockfill riprap(v) Site RestorationCleaning Sites(i) 300 Dunkirk Drive Outfall (S-MA50011492)(i) Standard sewer cleaning and CCTV inspection of outfall(ii) Installation of 1350 mm debris grate(iii) Site Restoration(j) Sturgeon Road Outfall (S-MA20003873)(i) Standard sewer cleaning and CCTV inspection of outfall(ii) Site Restoration(k) 242 Metcalfe Avenue Outfall (S-MA70011115)(i) HDD Outfall Cleaning(ii) Additional standard sewer cleaning (as required) and CCTV inspection of outfall(iii) Installation of 2100 mm diameter debris grate(iv) Site Restoration(l) 1 Hart Avenue Outfall (S-MA70043042)(i) HDD Outfall Cleaning(ii) Additional standard sewer cleaning (as required) and CCTV inspection of outfall(iii) Removal and re-installation of existing debris grate(iv) Site Restoration(m) 108 Selkirk Avenue Outfall (S-MA70007427)(i) HDD Outfall Cleaning(ii) Additional standard sewer cleaning (as required) and CCTV inspection of outfall(iii) Removal and re-installation of existing debris grate(iv) Site Restoration(n) Waterfront & McDermot Avenue Outfall (S-MA70145080)(i) HDD Outfall Cleaning(ii) Additional standard sewer cleaning (as required) and CCTV inspection of outfall(iii) Site Restoration(o) Granite Way Outfall (S-MA20014505)(i) HDD Outfall Cleaning(ii) Additional standard sewer cleaning (as required) and CCTV inspection of outfall(iii) Installation of 1800 mm diameter debris grate(iv) Site Restoration(p) 2464 Assiniboine Crescent Outfall (S-MA20005373)(i) Installation of temporary sewer plug(ii) Standard sewer cleaning and CCTV inspection of outfall(iii) Removal and re-installation of existing debris grate(iv) Site Restoration(q) 745 Tache Avenue Outfall (S-MA70017688)(i) Standard sewer cleaning and CCTV inspection of outfall(ii) Site Restoration(r) 3087 Vialoux Drive Outfall (S-MA60003875)(i) Standard sewer cleaning and CCTV inspection of outfall(ii) Site RestorationErosion Control Sites(s) 300 Bredin Drive Outfall (S-MA40005212)(i) Removal of (+/-) 9.7 m of existing 900 mm diameter CMP(ii) HDD Outfall Cleaning(iii) Additional standard sewer cleaning (as required) and CCTV inspection of outfall(iv) Installation of rockfill riprap(v) Installation of 900 mm diameter debris grate(vi) Site Restoration(t) 521 St. John Ambulance Way Outfall (S-MA20011467)(i) Riverbank regrading(ii) Installation of rockfill riprap(iii) Site Restoration(u) 63 Barker Boulevard Outfall (S-MA70007410)(i) Installation of rockfill riprap(ii) Installation of 1800 mm diameter debris grate(iii) Site RestorationD4.2 The following shall apply to the Work:(a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions;http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989(b) Universal Design Policyhttp://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
Key dates
- Posted
- November 8, 2021
- Response due
- November 24, 2021
Who is this buyer
Organization
Buying history
- Records46 total
- Opportunities / awards1 / 0
- ActiveSeptember 28, 2020 – August 14, 2026
What they buy
- Administrative (40)
- Clinical (6)
Also open from this buyer
View source document →
Source link on socrata.
Source record
- Buyer type
- County
- Jurisdiction
- (MB)
- Category
- Clinical
- Set-aside
- Not stated
- NAICS
- Not stated
- PSC
- Not stated