Opportunity
MRI AHU Modification
Response due
August 28, 2026
- Agency
- 242-NETWORK Contract Office 02 (36C242)
- Estimated value
- Not stated
36C24226R0060 Amendment 5 630A4-26-401 MRI AHU Modification 8. Question -Hallway Fan Coil Units-The contract documents indicate (6) 18,000 BTU/h chilled water surface-mounted fan coil units in the hallway. We have concerns with this configuration: the surface-mounted units would protrude into the corridor, presenting both an aesthetic issue and a potential head-strike hazard for pedestrians. We propose substituting ceiling-mounted fan coil units in lieu of the surface-mounted units. Please advise which of the following options is acceptable: VA Response: Option A would be acceptable if there is no additional cost to the VA. Six ceiling mounted units would provide both the desired level of equipment redundancy and distributed air flow equivalent to the contract design wall mounted units. An 18,000 btu wall mounted evaporator fan unit requires a minimum of 6 inches of clearance below the ceiling for proper air flow. As the evaporator fan coil unit is approximately 12-14 inches high, in an 8 foot high corridor (96 inches clear), there would be a minimum of 76 inches clearance under the evaporator fan unit, or 6 foot 3 inches. If the corridor is higher than 8 feet then the clearance would increase. Option A: Provide (6) ceiling-mounted fan coil units at 18,000 BTU/h each; note that due to ceiling constraints, the units cannot be equally spaced along the corridor. Option B: Provide (3) ceiling-mounted fan coil units of higher capacity, sized to provide equivalent total cooling capacity, spaced evenly along the corridor.
Key dates
- Posted
- August 26, 2026
- Response due
- August 28, 2026
Who is this buyer
Organization
Buying history
- Records348 total
- Opportunities / awards14 / 169
- Value range$0 – $9,606,161
- ActiveMay 4, 2026 – October 26, 2026
What they buy
- Clinical (272)
- Administrative (75)
- Insurance (1)
Set-asides used
- Small Business Set Aside - Total (28)
- SDVOSB Set-Aside (FAR 19.14) (22)
- No Set aside used (8)
- SDVOSB Sole Source (FAR 19.14) (1)
Who holds their work today
- STG INTERNATIONAL, INC.15 wins · $38,702,577 · last September 1, 2026
- VALOR HEALTHCARE INC11 wins · $20,724,362 · last April 1, 2026
- LABORATORY CORPORATION OF AMERICA4 wins · $11,145,845 · last October 1, 2026
- UNITED VETERANS BEACON HOUSE INC1 win · $9,049,598 · last September 25, 2026
- NEW YORK UNIVERSITY1 win · $8,724,936 · last October 1, 2024
Also open from this buyer
- Electrophoresis Testing for the Albany, Buffalo, and Syracuse VA Medical CentersDue November 2, 2026 · Clinical
- Z1DA--528A8-22-814 Consolidate Primary Care ReceptionDue November 6, 2026 · Administrative
- Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom LeaksDue November 4, 2026 · Administrative
- Emergency Residential and Case Management Services- VA New Jersey Health Care System- Health Care for Homeless Veterans (HCHV) ProgramDue December 31, 2026 · Administrative
Ways to meet this buyer
Upcoming
- November 6, 2026Pre-solicitation conference
Z1DA--528A8-22-814 Consolidate Primary Care Reception
Albany NY VA Medical Center
SAM.gov notice — 242-NETWORK Contract Office 02 (36C242)
View source document →
Source link on sam.gov.
Source record
- Buyer type
- Federal
- Jurisdiction
- Federal (US)
- Category
- Administrative
- Set-aside
- Not stated
- NAICS
- 236220
- PSC
- Y1DA